Program Management

Vilano Beachfront Park 

Vilano Beachfront Park Vilano Beach, FL DCCM provided comprehensive concept planning, master planning, engineering, and landscape architectural services for Vilano Beachfront Park on Vilano Road in St. Johns County, Florida. The project aimed to seamlessly integrate the preservation of the natural coastal environment with the historic character of the area, creating a unique space for civic engagement and social recreation.  Key features of Vilano Beachfront Park include a 1,300-square-foot pavilion that seats up to 190 people, designed to host concerts, educational events, and community gatherings. The pavilion incorporates rotating panels, which can be opened to provide ocean views or closed for events, and is equipped with performance lighting that is directed away from the Vilano Town Center, also considering turtle nesting season regulations.  Additional upgrades to Vilano Beachfront Park focus on enhancing accessibility and visitor experience. These include new changing stations, a recreational area featuring a climbing play structure, new outdoor showers, renovated restrooms, and improved parking with restriping for ADA compliance. A mobimat provides accessible beach entry along the northern boundary, while updated dune walkovers, including an ADA-compliant viewing turnaround, allow easy access for all. Vilano Beachfront Park provides the only disability-accessible beach in St. Johns County, with a wheelchair-accessible path to the sandy beach and a wooden ocean-viewing ramp. These enhancements ensure an inclusive coastal experience for all visitors.  At a Glance 1.7 Acres 109,000 Project Cost Inclusive Design Award from the Florida Planning and Zoning Association Project Award Markets Land Development Buildings Water Services Land & Site Development Buildings & Places Program Management Water & Wastewater

St. Johns County Health & Human Services Center

St. Johns County Health & Human Services Center St. Augustine, FL DCCM provided engineering services for the Health & Human Services facility located near the St. Johns County office complex. Completed in three phases, the project encompasses over 40,000 SF of building footprint on a 16-acre site. Notably, the Center’s stormwater facility includes a wet detention pond paired with two bio-retention ponds, providing diversity of landscaping to the site. Project scope included complete civil site design, stormwater and utilities infrastructure design, and permitting with St. Johns County, City of St. Augustine, FDEP and SJRWMD.   Our team coordinated and managed all aspects of this project and worked closely with the building architect, St. Johns County Construction Services, and St. Johns County Survey Department. We coordinated with subconsultants to determine the wetland line and flood plain impact, and conduct geotechnical investigations. We also worked with the City of St. Augustine Public Works Department, as the City provided utility service to this site, and USACE to obtain permitting for this project. Our team helped the county prepare bid specifications, assisted with bid evaluation, subsequent contract administration and engineering construction inspection of the contractor.   This project serves as an example of DCCM’s experience in working with several entities to complete a large project on an accelerated schedule.  At a Glance 40,000 Square Feet $63,000 Project Cost Markets Water Land Development Services Water & Wastewater Land & Site Development Program Management Utilities

Kubota Manufacturing of America (KMA)

Kubota Manufacturing of America (KMA) Gainesville, GA For more than two decades, DCCM has served as a trusted site services consultant to Kubota Manufacturing of America (KMA), one of Georgia’s premier producers of agricultural and construction equipment. As KMA’s operations have expanded, so has our role—providing comprehensive civil engineering and site development services to support long-term growth and innovation. Key Milestones:  2017 – Development of a new 498,860 SF RTV manufacturing facility on a 50-acre parcel  2022 – Site development for KMA’s $85M North American R&D Center on 280 acres, featuring 133,000 SF of office, workshop, and test track facilities, bringing 200 new jobs to the area  2024 – A new $190M, 700,000 SF front-end loader manufacturing facility on 50 acres, expected to create 500 jobs when fully operational  At a Glance 1,331,860 Square Feet $275M Project Cost Markets Land Development Buildings Services Land & Site Development Program Management Utilities Surveying

Verdera North Water Infrastructure Project

Verdera North Water Infrastructure Project

Verdera North Water Infrastructure Project Lincoln, CA The project provides the City with adequate drinking water supply and storage to enhance the resiliency of the water supply system and accommodate growth. Together these improvements provide the northern areas of Lincoln with safe and reliable drinking water. In addition, the metering station and 42-inch pipeline will also be used to serve a large portion of western Placer County when Placer County Water Agency’s future Ophir Water Treatment Plant and 60-inch pipeline is connected to the metering station. DCCM provided program management, project management and design oversite services from inception through construction including developing project budgets, consultant selection (engineering and CM), preliminary design studies, environmental processing, project approvals, design oversight, bidding and award, SCADA, construction, and start-up. The major elements of this $25M project included:  1.3-miles of 42-inch CMLC steel pipeline 4,500sf pressure reducing/metering station 5-MG pre-stressed concrete tank 0.9-miles of 36-inch ductile iron pipe  933-feet of 16-inch PVC pipeline to high elevation customers  Decommissioning a 7-acre municipal water storage pond Pad and yard piping for a future 5-MG tank Extensive oak tree mitigation planning Recreational trail around the project site At a Glance APWA Sacramento, CA Project of the Year “Environment (Water)” Award $25M Project Cost Markets Water Municipal Services Program Management Water

Sir Francis Drake Corridor Rehabilitation

Sir Francis Drake Corridor Rehabilitation

Sir Francis Drake Corridor Rehabilitation County of Marin, CA DCCM provided construction management, inspection and public outreach services for the rehabilitation of Sir Francis Drake Boulevard between Highway 101 and the Ross town limits. The major traffic artery has a daily traffic load of 45,000 vehicles. The project objectives were to improve vehicle flow, transit operations, and pedestrian and bicyclist circulation and safety. The construction project scope included removal and replacement of 60,000 square feet of curb, gutter and sidewalk, 5,000 linear feet of post and cable fence, the installation of 8,500 linear feet of welded steel water line, 80 new water service connections, new signalization and video detection cameras at seven major intersections, new streetlighting, over 1 million square feet of cold planing, 25,000 tons of new asphalt pavement, traffic striping and markers, new and replacement storm drain piping and structures, 25,000 linear feet of new signal interconnection conduit and wiring. In support of these construction activities, we monitored contractor traffic controls, temporary intersection signalization, storm water pollution controls, quality assurance, and materials testing. At a Glance $18.1M Project Cost Markets Transportation Services Program Management

Arcade-Cripple Creek Trail Bridge

Arcade-Cripple Creek Trail

Arcade-Cripple Creek Trail Citrus Heights, CA DCCM is providing construction management, inspection, and materials testing services for the Arcade-Cripple Creek Trail Project, the first city-wide trail in the City of Citrus Heights. The project includes the construction of a 2.9-mile paved multi-use trail, curb, gutter and sidewalk improvements, drainage improvements, traffic signal modifications, two pre-engineered steel pedestrian bridges, replacement of existing pedestrian bridge with a new 42-foot bridge, and installation of a new pedestrian bridge spanning 128-feet near the trail termination. The project is located within the City of Citrus Heights and the unincorporated community of Orangevale in Sacramento County. Once completed, the project will connect several neighborhoods to eight parks, several schools and the Sunrise MarketPlace. The project is funded by State Active Transportation Program (ATP) grant funds, which provide funds for projects that increase active transportation such as walking and biking and requires comprehensive knowledge of the state funding process to maintain the schedule and budget. At a Glance APWA Sacramento Project of the Year: “Park & Trails” Award $8.6M Project Cost Markets Transportation Services Program Management

Scroll to Top