Water Line

IH 45 and SH 6 Water Distribution System Improvements

IH 45 and SH 6 Water Distribution System Improvements Galveston County, Texas DCCM provided preliminary and final design and construction-phase services for 8,100 linear feet of 24-inch water line as part of a collaboration between the Galveston County Water Authority and Galveston County to provide potable water to a future residential area in Texas City. To accommodate this needed water line, an alignment was established at the intersection of Avenue L and a Galveston County Water Authority canal in Santa Fe, where the line connected to an existing water line and then extended along the north high bank of the canal to a metering station site west of IH 45. This project was funded by the State of Texas through a Community Development Block Grant and administered by the Texas General Land Office due to damage from Hurricane Ike. The funding was allocated to Galveston County, thereby funding the construction and managing the design and construction phases. At a Glance 8,100 Linear Feet 24-inch Water Line $1.8 million Csontruction Cost Markets Municipal Services Utilities Water & Wastewater

108-Inch Northeast Transmission Line, Contract 99D-2

108-Inch Northeast Transmission Line, Contract 99D-2 Houston, Texas DCCM provided final engineering design and construction-phase services for 1.4 miles of 108-inch water main from Aldine Westfield Road to Willis Street in north Houston. This project was extremely complex due to the size of the water main and the congested area where the alignment was located. DCCM worked with the City of Houston and its Program Manager to develop a 50-foot water line easement through an existing urban region. To develop the preferred alignment, DCCM considered construction issues, including laydown areas, environmental constraints, traffic impacts, and existing utilities. DCCM developed alignment alternatives, such as tunnels instead of open-cut construction, in multiple areas to minimize or eliminate significant impacts on existing businesses, as numerous commercial buildings are close to the route. Tunnels were designed to mitigate the impact on the buildings and their operations in these areas. Since the project was in an urban region, DCCM worked closely with the existing utilities to develop utility conflict documents and support their relocation. The design also included construction phasing and traffic control to maintain access to residences, facilities, and emergency services. The water line was a significant transmission main constructed via open-cut and tunneling methods. Each method was optimized for the project. At a Glance 108-inch Water Main 7,400 Linear Feet $31 million Construction Cost Markets Municipal Surveying Services Water & Wastewater Surveying Utilities

42-inch Water Line Design, Segment 3 A1

42-inch Water Line Design, Segment 3 A1 Harris County, Texas DCCM provided final design and construction phase services for 14,000 linear feet of 42-inch water transmission line within a CenterPoint Energy electric transmission line corridor and easement. This water line is part of the West Harris County Regional Water Authority’s (WHCRWA) 2025 system, which will meet at least 60% of water demand with surface water. This is the latest project in a long history of working with WHCRWA to supply their surface water requirements. The project involved installing water lines in CenterPoint Energy’s electrical transmission line corridor for miles. Trenchless construction was required within 20 feet of truss towers and across busy roadways. Close coordination was maintained with the City of Houston and Harris County for permitting and the acquisition of record drawings. Collaboration with the design engineer ensured a proper connection to an 84-inch water line. Additionally, coordination with multiple petroleum pipelines and dry utilities in CenterPoint Energy’s corridor was necessary. At a Glance 42-inch Water Transmission Line $8.9 million Construction Cost Markets Municipal Surveying Services Water & Wastewater Program Management Surveying Utilities

Scroll to Top