Avenue S Rehabilitation

Galveston County

DCCM provided the design of 8,600 linear feet of roadway reconstruction along Avenue S from 53rd Street to Seawall Boulevard. The paving cross-section comprised two travel lanes with two outside parking areas. The project design included replacing 8,900 linear feet of water line, including branches and intersections along the route, crossing intersections that were previously reconstructed for other concurrent projects.

Additionally, a 15-inch sanitary sewer was replaced, stretching from 35th Street to 33rd Street, including branches and intersections. Our assessment of the drainage system along the corridor and side streets enabled us to determine the most effective methods for enhancing drainage efficiency while removing bridge blocks. The flat terrain of Galveston provided grading challenges, and with our detailed 3D grading abilities, the shallow underground storm system had the proper cover under the road and for some instances where standard cover was not achievable, it was discovered and known during the design or it was identified during construction and the design remedies were ready before construction was delayed.

Our subconsultants performed geotechnical, surveying, SUE, environmental, and inspection services for the project.

DCCM provided construction phase services for the City of Galveston and collaborated with the contractor to ensure the design intent was effectively implemented. The final product of the road was excellent, and the contractor successfully constructed the road and storm sewer system with minimal RFIs and minor adjustments to the road, sidewalks, and storm sewer system grading. All meetings were accompanied by a well-organized agenda and meeting minutes, which included detailed action items to be completed by the next meeting. This attention to detail and accountability helped lead the project to a successful completion and limited citizen complaints.

Surveying Services

DCCM supported land surveying services for 2.5 miles of Avenue S from 53rd Street east to Seawall Boulevard Drive. Tasks included right-of-way (ROW) determinations, topographic surveying, and subsurface utility surveying to support engineering design. The project included a full-depth replacement of existing pavement and utilities, including water lines and subsurface sanitary and storm sewer systems. Approximately 275 parcels were abstracted to support ROW determinations and graphically depict property ownership.

Survey control was established, including ground targets for aerial triangulation of UAS/drone imagery acquired by a subconsultant. Lidar data was also collected, post-processed, and delivered to us for analysis and integration into our survey. Supplemental ground surveying was performed to support the validation of the imagery and lidar data. Final deliverables included 3D mapping in Civil 3D format and rectified orthomosaic imagery of the project extents.

SUE Services

DCCM provided SUE services along 8,600 linear feet of water and sanitary sewer line from Avenue S from 53rd Street to Seawall Boulevard. The SUE QL-B designation revealed more than 56,000 feet of utilities in that area. As in all SUE projects, the utility mainlines were designated. This project was unusual because all utility services were also designated so that the designers would have substantial utility information and the best chance to protect the utilities in place—this required electronically traceable duct runners, fish tapes, and electromagnetic sweeping.

At a Glance

$9.25 million

Construction Cost

$146,000

Survey Cost

86,000

Linear Feet of Sanitary Sewer Line

56,000

Feet of Utilities