DCCM provided preliminary and final design, bidding, and construction-phase services for reconstructing 12,220 linear feet of neighborhood residential streets and a collector street within the City of Pasadena. The project comprised nine separate residential streets, including West Park Lane, Madison Avenue, Austin Avenue, Easthaven Drive, Magnolia Street, Tilden Drive, Polk Avenue, Kansas Street, and Llano Street, a major collector. 

The project scope included the complete reconstruction of existing neighborhood concrete roads, including storm sewer, sanitary sewer, and water line replacements and upgrades. The project also included Americans with Disabilities Act (ADA)-compliant sidewalks/shared-use paths and ramps, signing and pavement markings, traffic control, a stormwater pollution prevention plan (SWPPP), a complete drainage study, and a geotechnical report.

This reconstruction project was bid on a unit-price basis before design began and executed on a fast-track schedule. This included close coordination between DCCM and the contractor during the design and continuous coordination with the City of Pasadena and the contractor. This close coordination allowed changes to be quickly made in the field during construction as required. Portions of the project required innovative engineering to provide the necessary detention within the street’s limits. This fast-track process will set the path for future projects designed and constructed within the City of Pasadena. The design and reconstruction of all streets were completed within an accelerated 12-month schedule.

At a Glance

12,220

Linear Feet

$11.4 million

Construction Cost

Services

Markets

Scroll to Top