CEI

2020 Multi-Street Reconstruction

2020 Multi-Street Reconstruction Pasadena, Texas DCCM provided preliminary and final design, bidding, and construction-phase services for reconstructing 12,220 linear feet of neighborhood residential streets and a collector street within the City of Pasadena. The project comprised nine separate residential streets, including West Park Lane, Madison Avenue, Austin Avenue, Easthaven Drive, Magnolia Street, Tilden Drive, Polk Avenue, Kansas Street, and Llano Street, a major collector.  The project scope included the complete reconstruction of existing neighborhood concrete roads, including storm sewer, sanitary sewer, and water line replacements and upgrades. The project also included Americans with Disabilities Act (ADA)-compliant sidewalks/shared-use paths and ramps, signing and pavement markings, traffic control, a stormwater pollution prevention plan (SWPPP), a complete drainage study, and a geotechnical report. This reconstruction project was bid on a unit-price basis before design began and executed on a fast-track schedule. This included close coordination between DCCM and the contractor during the design and continuous coordination with the City of Pasadena and the contractor. This close coordination allowed changes to be quickly made in the field during construction as required. Portions of the project required innovative engineering to provide the necessary detention within the street’s limits. This fast-track process will set the path for future projects designed and constructed within the City of Pasadena. The design and reconstruction of all streets were completed within an accelerated 12-month schedule. At a Glance 12,220 Linear Feet $11.4 million Construction Cost Markets Municipal Surveying Transportation Services Surveying Transportation Utilities Water & Wastewater

42-inch Water Line Design, Segment 3 A1

42-inch Water Line Design, Segment 3 A1 Harris County, Texas DCCM provided final design and construction phase services for 14,000 linear feet of 42-inch water transmission line within a CenterPoint Energy electric transmission line corridor and easement. This water line is part of the West Harris County Regional Water Authority’s (WHCRWA) 2025 system, which will meet at least 60% of water demand with surface water. This is the latest project in a long history of working with WHCRWA to supply their surface water requirements. The project involved installing water lines in CenterPoint Energy’s electrical transmission line corridor for miles. Trenchless construction was required within 20 feet of truss towers and across busy roadways. Close coordination was maintained with the City of Houston and Harris County for permitting and the acquisition of record drawings. Collaboration with the design engineer ensured a proper connection to an 84-inch water line. Additionally, coordination with multiple petroleum pipelines and dry utilities in CenterPoint Energy’s corridor was necessary. At a Glance 42-inch Water Transmission Line $8.9 million Construction Cost Markets Municipal Surveying Services Water & Wastewater Program Management Surveying Utilities

FM 1097 Widening, Segments 1, 2, 3

FM 1097 Widening, Segments 1, 2, and 3 Montgomery County, Texas This project was a joint effort between Montgomery County and TxDOT. It involved widening an existing two-lane road with a dedicated left-turn lane into a four-lane road with a dedicated left-turn lane. DCCM was responsible for identifying utilities, coordinating design, reviewing permits and utility agreements, and overseeing relocation. Utility adjustments were needed for all utilities due to most right-of-way being taken on one side, and DCCM worked closely with right-of-way to prioritize parcel acquisitions so utilities could complete adjustments without delays. Utilities included Entergy, Kinder Morgan pipeline, CenterPoint Energy, numerous telecommunication lines, and the City of Willis water and wastewater. DCCM worked with the design team to mitigate utility conflicts that could be costly or require long lead times for adjustments. Our team set up several utility workshops among the roadway design team, the utility owner, and the construction area office to work through the details to protect the pipeline in place and avoid a costly relocation. Other coordination efforts included working with the design team on traffic control phasing to give utilities more time for adjustments while allowing the roadway contractor to continue working without delay. At a Glance $325,000 Project Cost $48 million Construction Cost Markets Power Services Utilities

Avenue S Rehabilitation

Avenue S Rehabilitation Galveston County DCCM provided the design of 8,600 linear feet of roadway reconstruction along Avenue S from 53rd Street to Seawall Boulevard. The paving cross-section comprised two travel lanes with two outside parking areas. The project design included replacing 8,900 linear feet of water line, including branches and intersections along the route, crossing intersections that were previously reconstructed for other concurrent projects. Additionally, a 15-inch sanitary sewer was replaced, stretching from 35th Street to 33rd Street, including branches and intersections. Our assessment of the drainage system along the corridor and side streets enabled us to determine the most effective methods for enhancing drainage efficiency while removing bridge blocks. The flat terrain of Galveston provided grading challenges, and with our detailed 3D grading abilities, the shallow underground storm system had the proper cover under the road and for some instances where standard cover was not achievable, it was discovered and known during the design or it was identified during construction and the design remedies were ready before construction was delayed. Our subconsultants performed geotechnical, surveying, SUE, environmental, and inspection services for the project. DCCM provided construction phase services for the City of Galveston and collaborated with the contractor to ensure the design intent was effectively implemented. The final product of the road was excellent, and the contractor successfully constructed the road and storm sewer system with minimal RFIs and minor adjustments to the road, sidewalks, and storm sewer system grading. All meetings were accompanied by a well-organized agenda and meeting minutes, which included detailed action items to be completed by the next meeting. This attention to detail and accountability helped lead the project to a successful completion and limited citizen complaints. Surveying Services DCCM supported land surveying services for 2.5 miles of Avenue S from 53rd Street east to Seawall Boulevard Drive. Tasks included right-of-way (ROW) determinations, topographic surveying, and subsurface utility surveying to support engineering design. The project included a full-depth replacement of existing pavement and utilities, including water lines and subsurface sanitary and storm sewer systems. Approximately 275 parcels were abstracted to support ROW determinations and graphically depict property ownership. Survey control was established, including ground targets for aerial triangulation of UAS/drone imagery acquired by a subconsultant. Lidar data was also collected, post-processed, and delivered to us for analysis and integration into our survey. Supplemental ground surveying was performed to support the validation of the imagery and lidar data. Final deliverables included 3D mapping in Civil 3D format and rectified orthomosaic imagery of the project extents. SUE Services DCCM provided SUE services along 8,600 linear feet of water and sanitary sewer line from Avenue S from 53rd Street to Seawall Boulevard. The SUE QL-B designation revealed more than 56,000 feet of utilities in that area. As in all SUE projects, the utility mainlines were designated. This project was unusual because all utility services were also designated so that the designers would have substantial utility information and the best chance to protect the utilities in place—this required electronically traceable duct runners, fish tapes, and electromagnetic sweeping. At a Glance $9.25 million Construction Cost $146,000 Survey Cost 86,000 Linear Feet of Sanitary Sewer Line 56,000 Feet of Utilities Markets Transportation Surveying Services Transportation Program Management Surveying Utilities Water & Wastewater

Cedar Bayou Crossing Corridor Study

Cedar Bayou Crossing Corridor Study Harris County and Baytown, Texas DCCM was selected to provide professional services for the proposed Cedar Bayou crossing. The crossing will serve as a critical link for the City of Baytown to ensure the orderly development of the northern part of the city and provide necessary east-to-west mobility to supplement IH 10. The project area was from Hunt Road at Main Street to Kilgore Parkway at SH 146. DCCM provided project management, data collection, existing condition evaluation, alternative analysis, community outreach support, preliminary engineering, geotechnical investigation, subsurface utility engineering, survey, and an environmental analysis. DCCM conducted a corridor study to identify alignment alternatives and assess the project’s feasibility. The study included several aspects to consider and required sufficient information to measure and evaluate a range of viable improvement options. The traffic analysis reviewed traffic and crash data, existing roadways, traffic flow patterns, traffic counts, turning movement counts, and transit and traffic operations. The DCCM team conducted capacity analyses for designated locations and sections of roadways and made recommendations to improve traffic flow. DCCM provided hydrology and hydraulics (H&H) to support the corridor layout of the proposed roadway. This task used the latest Mapping, Assessment, and Awareness project (MAAPNEXT) models for Cedar Bayou as developed by the Harris County Flood Control District. DCCM also provided community outreach, public meetings, and City Council meetings. The project concluded with identifying recommended improvements, preliminary plans with several alternatives and their estimated costs, and a preferred alignment. Surveying Services DCCM performed professional surveying services to obtain and review existing lidar data and the limited preliminary ground survey data for the Cedar Bayou Corridor Study. The project spanned 3.7 miles from North Main Street, 3,300 feet south of IH 10 (west tie-in point), to the intersection of SH 146 and Kilgore Parkway (east tie-in point). The latest available lidar data published from USACE and Texas Natural Resources Information System covering the project area to evaluate and perform the following tasks: Data sets were extracted/downloaded into Esri ArcGIS (Pro+3D Analyst tool) and Context Capture/OpenRoads Cross-data checks were performed against public datasets from TxDOT, the City of Baytown, Harris County, and other available online resources. The MicroStation DGN deliverable included: DEM 2D building/structure footprints Roads, highways, and railroads Overhead transmission lines Other visible features within the lidar data Limited field surveying was performed. Field surveying tasks included setting four project control points, performing limited topographic surveying along North Main Street (1,000 feet north and south of the west tie-in point) and SH 146 (500 feet north and south of the west tie-in), and obtaining cross sections along the existing railroad running through the project. Field surveying also included determining the elevations of the existing railroad running at the railroad bridge over SH 146 and confirming (spot-checking) the lidar data in several accessible areas. The survey data was based on the NAD 83, Texas Coordinate System, South Central Zone (4204) CORS adjustment. Elevations were based on the NAVD 88 2001 adjustment relative to the lidar data. The survey information was provided in MicroStation Select Series 10. At a Glance 3.7 Miles $140 million Construction Cost Markets Transportation Surveying Services Transportation Surveying Utilities Water & Wastewater

US 59 South Reconstruction

US 59 South Reconstruction Rosenberg, Texas DCCM provided construction management, utility coordination, and roadway/utility inspection services for the construction and inspection of US 59 South from west of SH 762 to west of FM 2759 in Richmond. The transformation of the roadway included widening US 59 from a four-lane rural freeway to an eight-lane freeway, with two-way high-occupancy vehicle lanes and improved frontage roads. Also included in this project were upgrades to grading, cement-treated base, concrete pavement, a computerized transportation management system, bridges, a storm drain, signing, pavement marking, lighting, and traffic signals. DCCM provided support for the inspection of substructures and superstructures on this project. DCCM also assigned utility inspectors to verify the proposed alignment of utility relocation and to monitor the installation of utilities, working closely with owners and assigned subcontractors to ensure that the proposed utilities were placed per the approved plan and profile. At a Glance $162 million Project Cost Markets Transportation Services Transportation

SH 249 (Tomball Tollway), Phase II and Four Direct Connectors

SH 249 (Tomball Tollway), Phase II and Four Direct Connectors Tomball, Texas DCCM performed construction engineering inspection services for the SH 249 (Tomball Tollway), Phase II, and the SH 249 (Tomball Tollway) and SH 99 (Grand Parkway) direct connectors projects. DCCM provided Field Engineers, Office Engineers, Critical Path Method, Sr. Scheduler, Construction Inspectors, and Utility Inspectors for both projects. DCCM also performed subsurface utility engineering as needed for fiber-optic cables (AT&T, Verizon), pipelines, and City of Tomball water lines. In addition, DCCM reviewed the detection of defects or deficiencies in the project contractor’s work. To support timely project completion, DCCM responded to the project request for information, coordinated and tracked submittals, reviewed and approved required project shop drawings, and provided other services requested by the Harris County Toll Road Authority. SH 249 (TOMBALL TOLLWAY), PHASE II CONSTRUCTION The project included the construction of six toll lanes and two three-lane frontage roads, including grading, embankment, drainage, structures, stormwater detention, signing, cement-treated base, stormwater pollution prevention plan, tolling infrastructure, a computerized transportation management system, and continuously reinforced concrete pavement. SH 249 (TOMBALL TOLLWAY) AND SH 99 (GRAND PARKWAY) DIRECT CONNECTORS The project included the construction of the SH 249 (Tomball Tollway) and SH 99 (Grand Parkway) four direct connectors and approaches, including traffic control, earthwork, grading, paving, structures, retaining walls, drainage, illumination, signing, pavement markings, an intelligent transportation system, and cross-sections. At a Glance $99 million Phase II $92 million Direct Connectors Markets Transportation Services Transportation

IH 45 South Expansion

IH 45 South Expansion Galveston County, Texas The expansion of IH 45 South in Galveston County was designed to widen the interstate and improve mobility in a region that has seen continuous growth in recent years. DCCM provided utility relocation and inspection (including water line, communication cable, and gas line), grading, concrete pavement, asphalt-stabilized base, cement- and lime-treated base/subgrade, bridge structures, storm sewer, and detentions. Construction of the widening of a freeway facility included grading, concrete pavement, asphalt-stabilized base, cement-treated base, lime-treated subgrade, asphalt concrete pavement, bridge structures, storm sewers, detention ponds, retaining walls, signing, pavement markings, traffic signals, continuous lighting, and a traffic management system. DCCM was selected to perform utility coordination, subsurface utility engineering, and utility inspection for the entire project. DCCM provided utility coordination and relocation for Frontier, AT&T, Comcast, CenterPoint Energy gas, Texas-New Mexico Power, and Phonoscope. DCCM performed subsurface utility engineering to identify the existing 39-inch encased water line (City of League City) that hindered the construction of the drilled shaft and stone columns along abutment No. 1 on the SH 96 bridge widening. TxDOT also entrusted DCCM with reviewing and approving permit applications for the entire project’s proposed relocation. At a Glance $101.7 million Project Cost Markets Transportation Services Transportation