Tennessee

Lake June Phase 1 – Pump Station

June Lake Phase 1 – Pump Station Spring Hill, Tennessee  June Lake is a premiere mixed-use development located on nearly 800-acres at the gateway to the City of Spring Hill, Tennessee. Located adjacent to I-65, June Lake is fully entitled for 2,900 homes, 3.9 million SF of commercial office space, 1.3 million SF of retail and restaurant space, and 400 hotel rooms. DCCM was contracted to design and permit the water and sewer infrastructure for the development, including the Phase 1 sanitary sewer lift station. The lift station was designed to manage a peak demand of 604 gpm, with a total dynamic head (TDH) of 70.2 ft. The design was complicated by the force main having to overcome two separate high points. Ultimately, a steady-state analysis determined that the water column within the force main would start to separate at Station 14+00 and become gravity flow at Station 14+40. The lift station has a 10-ft diameter wet well and utilizes duplex 50-horsepower suction-lift Gorman-Rupp pumps. The station is equipped with an emergency bypass quick-connect fitting and valving that allows City maintenance equipment to continue to manage the demand if the pumps are offline. Services included survey, engineering design, permitting, and construction administration. At a Glance $85,000 Design Cost Markets Water Surveying Services Water & Wastewater Surveying

Shelby House Samaritan Recovery Center

Shelby House Samaritan Recovery Center Nashville, Tennessee DCCM’s survey team in Nashville provided construction staking services for Phase II of the Shelby House Samaritan Recovery Center in Nashville, Tennessee. Phase I of the development included the completed Shelby House and the initial Samaritan Recovery Community facilities. Shelby House is an affordable housing project designed to support individuals transitioning out of homelessness. The 44‑unit facility offers a range of supportive services focused on promoting long‑term stability and self‑sufficiency for its residents. The Samaritan Recovery Community complements this mission by providing comprehensive recovery services for individuals overcoming substance abuse. The campus includes residential treatment, outpatient services, and supportive housing, all tailored to foster sustainable recovery. During Phase II, construction took place while the Samaritan Recovery Community remained fully operational. Contractors developed expanded facilities to meet growing demand, effectively doubling the organization’s capacity to serve the community. The expansion also added much‑needed affordable housing to the downtown Nashville area, further reinforcing the project’s community‑focused impact. Photo Courtesy of Holladay Ventures At a Glance 2 Phases Markets Surveying Services Surveying

Vanderbilt Legends Clubhouse Renovation and Expansion

Vanderbilt Legends Clubhouse Renovation and Expansion Franklin, Tennessee DCCM was engaged by Meyers+Associates to deliver comprehensive land surveying and civil engineering services for the expansion of the Vanderbilt Legends Golf Clubhouse. Our scope of work focused on producing a detailed topographic survey, site construction drawings, and complete permit application packages to support the proposed building enhancements. The expansion project encompassed the addition of kitchen facilities, new locker rooms, a second-level fitness center, administrative office space, a new elevator, and enlarged outdoor terrace areas. In a prior phase of the renovation, DCCM was also selected to design the regrading of the practice green, incorporating stormwater management solutions. At a Glance $42,000 Design Cost Markets Land Development Surveying Services Land & Site Development Surveying

Scroll to Top