30-Inch Pipeline Replacement

Jefferson and Port Arthur, Texas

DCCM replaced 8,000 linear feet of 30-inch natural gas pipeline in Jefferson County. Two 4,000 linear foot horizontal directional drills were used to relocate the proposed pipeline through the wetland and under three drainage canals. Close coordination took place with the U.S. Army Corps of Engineers and Jefferson County Drainage District No. 7 to minimize disturbance to the existing wetland and canals. Binkley & Barfield provided engineered plan and profile drawings, topographical surveys, line verification, metes-and-bounds descriptions for new easements, construction staking, as-built surveys, and as-built plans.

At a Glance

8,000 Linear Feet

30-inch Natural Gas Pipeline

$203,671

Project Cost