Aerial Fiber Route Design Verification and Documentation
Harris, Fort Bend, Brazoria, Galveston, and Waller Counties
DCCM performed an as-built field survey of the aerial fiber route to verify that it was installed according to design at the correct attachment height. We obtained and documented the heights of all telecommunications cables and electrical conductors in a database spreadsheet. We analyzed the field data for compliance with the design. We created a pass/fail analysis indicating which fiber attachments complied with the design and the National Electrical Safety Code® (NESC) clearance standards. Our team determined which fiber attachments failed and did not comply with the design and NESC clearance standards.
SERVICES PROVIDED
- Aerial fiber route pole attachment measurements and documentation
- Pole attachment photos
- Spreadsheet database documentation
- Verification of design compliance
- Analysis of pass/fail for attachments meeting NESC clearances
At a Glance
2024
Construction Completion
Confidential
Project Cost