DCCM acted as the Owner’s Representative and led the front-end design for the I-70 Design-Build project. The project added travel lanes and improved I-70 from 1.1 miles west of Mt. Comfort Road to 1.3 miles east of SR 9. Key elements included about 10 miles of new lanes, modernized interchanges, on-ramp reconfiguration, pavement rehabilitation, bridge replacements and rehabilitations, new signage and lighting, ITS tower relocation with fiber extension, small structure replacements, and drainage upgrades. These improvements will substantially increase capacity, support efficient traffic flow, and bring the corridor up to current standards. 

At a Glance

10 Miles

Project Size

$184M

Project Cost

ACEC State Finalist