Florida

Panther Parkway

Panther Parkway

Panther Parkway Sebring, FL PHASE I – In fall 2001, DCCM completed the design for widening approximately one mile of Fairmount Drive from a two-lane local road to a five-lane major collector with sidewalks. Construction was completed by the end of 2002 at a cost of $500,000. PHASE II – DCCM supported the County by designing highway lighting and signalization for six intersections and preparing the design and permitting for six stormwater retention ponds along the two-mile route. PHASE III – In January 2017, DCCM contracted with the Highlands County Board of County Commissioners to modify the design of a 4.3-mile segment of Sebring Parkway Phase III between Sebring and Avon Park. The original design and permit, completed by others, proved cost-prohibitive and jeopardized an FDOT CIGP Grant. Leveraging our expertise in stormwater permitting, DCCM redesigned the entire roadway and modified the Environmental Resource Permit, managing $3.2M in FDOT funding. Construction, estimated at $8M, began in March 2018. By August 2019, the north-end connection to the Memorial Drive Roundabout was completed, and the Sebring Roundabout (formerly Panther Parkway) on the south end was finished by year-end 2019. At a Glance 4.3 Miles Project Size $10M Project Cost Markets Transportation Services Transportation

PK Avenue Stormwater & Roadway Improvements

PK Avenue Stormwater & Roadway Improvements

PK Avenue Stormwater & Roadway Improvements Auburndale, FL DCCM provided watershed planning, conceptual design, feasibility analysis, surveying, and cooperative funding support to develop a concept improvement plan for 3,500 linear feet of PK Avenue.  As the gateway to downtown Auburndale, the City sought improvements that would not only resolve chronic roadway flooding and enhance stormwater quality for the 261-acre urban drainage basin but also improve neighborhood aesthetics and add a pedestrian trail for recreation.  The recommended concept redeveloped PK Avenue from four lanes to two and incorporated low-impact development techniques, including bio-retention swales, on-street pervious parking with subsurface storage, and a one-acre retention pond. Our team also assisted the City in securing $1.3M in cooperative funding from the Southwest Florida Water Management District (SWFWMD). At a Glance 2019 Grand Award for Engineering Excellence in Water and Stormwater from ACEC-FL Award 2019 Award of Merit from ASLA-FL Award Markets Water Surveying Services Water Surveying

Northeast Regional Park Baseball Complex Expansion

Northeast Regional Park Baseball Complex Expansion

Northeast Regional Park Baseball Complex Expansion Davenport, FL The Northeast Regional Park (NERP) Baseball Complex expansion included four collegiate baseball fields with lighting, fencing, synthetic turf, and a multipurpose concession building featuring restrooms and storage space.  DCCM provided comprehensive services for this project, including land surveying, master planning, civil site and landscape design, environmental permitting, bidding, and construction phase support.  During construction, our project manager oversaw critical tasks such as materials testing, attending bi-weekly construction meetings, reviewing and approving contractor submittals, responding to RFIs, change orders, and pay applications, and conducting site walk-throughs.  Teaming partners included The Lunz Group (architectural services), S&ME (landscape architecture), MES Group (mechanical, electrical, and plumbing engineering), and OSPORTS (synthetic turf design and planning).  At a Glance 36.78 Acres $5.6M Construction Cost Markets Surveying Buildings Land Development Services BUILDINGS & PLACES Surveying Site/Civil Land Planning Land & Site Development

Scroll to Top