Surveying

SH 249 (Tomball Tollway), Phases I and II

SH 249 (Tomball Tollway), Phases I and II Tomball and Montgomery County, Texas DCCM was contracted by the Harris County Toll Road Authority (HCTRA) as the Program Management Consultant (PMC) for the design and management of both preliminary and final project designs, as well as construction management and inspection services for Phase II. We developed a project feasibility assessment, which resulted in the SH 249 (Tomball Tollway), Phases I and II engineering feasibility report, and served as the basis for the final design. On its first day of operation, eager toll users doubled the projected 17,000 daily toll transactions, cutting traffic on the existing frontage road in half. Funded entirely with toll road revenue paid by drivers who choose to use the Harris County toll road system, the final construction will extend the toll road into Montgomery and Grimes Counties to SH 105, streamlining trips to and from rapidly growing Grimes County and College Station. Phase I: Spring Cypress Road to FM 2920 This project provided travelers with four main lanes in each direction and was constructed between the existing TxDOT northbound and southbound non-tolled frontage roads. As PMC for HCTRA, DCCM completed an aggressive 9-month design program to deliver plans, specifications, and estimates (PS&E) for HCTRA to bid and construct this phase. DCCM provided leadership, schedule adherence, quality assurance, and oversight to 17 consultants, completing the PS&E for four new toll lanes in each direction along a 6-mile stretch of SH 249, adding five new bridges, retaining walls, and a drainage system that mitigates flooding. Drivers may now bypass seven stoplights while the frontage roads remain toll-free. All milestone submittals were met on time, and the project was constructed in only 16 months and under three construction contracts. Phase I was open to traffic in April 2015 and is exceeding all revenue forecasts.  Phase II: FM 2920 to Spring Creek (Harris/Montgomery County line) Design preparations for Phase II began in October 2014 with design revisions to the TxDOT 2006 SH 249 Schematic. As in Phase I, DCCM was the PMC for the design of four-lane toll lanes in each direction, adding three-lane frontage roads on both north- and southbound approaches, five major bridges, flood-mitigating storm sewer detention, a collegiate practice field, and equestrian and bike trails. Services also included computing cut-and-fill quantities for roadway sections, concrete and reinforcement steel quantities for bridge deck pours, and payments for such pours on the contractor’s pay estimate. DCCM monitored the roadway excavation, subgrade preparation, concrete milling, embankment placement for abutments, installation of drill shaft and foundations, concrete beam placement, asphalt pavement placement, bent footings, column, cap pours, reinforced earth walls, 18- to 36-inch reinforced concrete pipes, and various concrete box culverts. Our team oversaw construction management and inspection services for this segment of the project.  Phases I and II of the SH 249 (Tomball Tollway) project included environmental investigations and permitting, survey/ROW mapping, utility identification and assessment, subsurface utility engineering, and hydrologic and hydraulic modeling and detention pond design. DCCM also provided construction phase services for Phase II and the direct connectors at SH 99 (Grand Parkway). Mainlanes, Phase I, Section 1 – Montgomery County MCTRA selected DCCM to prepare PS&E for mainlane and ramp construction for a 0.4-mile section of tollway north of Tomball, Texas. The project scope included roadway geometric design, traffic control plans, removal plans, drainage plans with both open and closed systems, SWPPP, cross-sections, general notes, specifications, and construction cost estimates. The DCCM team coordinated with both adjacent designers on the Montgomery County segment and with the design and construction teams of the Harris County segment to the south to deliver a synchronized product that minimized impacts to travelers and adjacent property owners and reduced overall project costs. At a Glance $101 million Phase I Construction Cost $99 million Phase II Construction Cost Markets Transportation Services Transportation Utilities Surveying Water & Wastewater

Dollar General Stores

Dollar General Stores

Dollar General Stores Statewide, Georgia Since 2012, DCCM has been a trusted partner to Sullivan-Wickley Properties, LLC in supporting the strategic expansion of Dollar General stores across Georgia. With more than 200 locations and counting, our team has delivered comprehensive due diligence, surveying, civil design, and permitting services for sites in urban, suburban, and rural communities throughout the state.  Georgia’s diverse topography and soil conditions, from mountainous terrain to coastal plains, demand adaptive, site-specific solutions. DCCM brings extensive experience in tailoring national site development standards to meet the unique requirements of local jurisdictions. Our thorough due diligence process supports confident Go / No-Go decisions, while our proactive coordination with municipalities frequently accelerates permitting without the need for variances. When additional entitlement services are required, our in-house experts are ready to lead the process. This partnership reflects DCCM’s broader track record of supporting multi-site regional and national rollouts for brands such as Taco Bell, Del Taco, Pep Boys, and Texaco, representing over 700 locations across several states. At a Glance 200+ Locations Markets Land Development buildings Surveying Services Land & Site Development Surveying Utilities

Fox Factory Corporate Relocation

Fox Factory Corporate Relocation Gainesville, Georgia When Fox Factory, a premier designer and manufacturer of high-performance suspension systems, opted to relocate its headquarters from California to Georgia, DCCM was selected to support the transition from the ground up. As part of a confidential, fast-tracked initiative, we provided strategic site selection and civil engineering services to help identify and evaluate multiple locations before securing a 23-acre site for the company’s new home.  The resulting 350,000 square foot vertically integrated campus now houses manufacturing, distribution, and office operations for more than 800 employees. Working in collaboration with Carroll Daniel Construction Co. as part of a design-build team, DCCM delivered civil site services that contributed to a 16-month, on-budget completion.  At a Glance 350,000 Square Feet $47 million Project Cost Markets Land Development Services Land & Site Development Surveying

PK Avenue Stormwater & Roadway Improvements

PK Avenue Stormwater & Roadway Improvements

PK Avenue Stormwater & Roadway Improvements Auburndale, Florida DCCM provided watershed planning, conceptual design, feasibility analysis, surveying, and cooperative funding support to develop a concept improvement plan for 3,500 linear feet of PK Avenue.  As the gateway to downtown Auburndale, the City sought improvements that would not only resolve chronic roadway flooding and enhance stormwater quality for the 261-acre urban drainage basin but also improve neighborhood aesthetics and add a pedestrian trail for recreation.  The recommended concept redeveloped PK Avenue from four lanes to two and incorporated low-impact development techniques, including bio-retention swales, on-street pervious parking with subsurface storage, and a one-acre retention pond. Our team also assisted the City in securing $1.3M in cooperative funding from the Southwest Florida Water Management District (SWFWMD). At a Glance 2019 Grand Award for Engineering Excellence in Water and Stormwater from ACEC-FL Award 2019 Award of Merit from ASLA-FL Award Markets Water Surveying Services Water Surveying

Scroll to Top