Portfolio

30-Inch Pipeline Replacement

30-Inch Pipeline Replacement Jefferson and Port Arthur, Texas DCCM replaced 8,000 linear feet of 30-inch natural gas pipeline in Jefferson County. Two 4,000 linear foot horizontal directional drills were used to relocate the proposed pipeline through the wetland and under three drainage canals. Close coordination took place with the U.S. Army Corps of Engineers and Jefferson County Drainage District No. 7 to minimize disturbance to the existing wetland and canals. DCCM provided engineered plan and profile drawings, topographical surveys, line verification, metes-and-bounds descriptions for new easements, construction staking, as-built surveys, and as-built plans. At a Glance 8,000 Linear Feet 30-inch Natural Gas Pipeline $203,671 Project Cost Markets Power Services Utilities

Inter-Agency Infrastructure Coordination and Assessment Tool

Inter-Agency Infrastructure Coordination and Assessment Tool Harris County, Texas DCCM was selected as the prime firm for assembling an Inter-agency Infrastructure Coordination and Assessment Tool. The purpose of the tool was to assist Harris County and partner agencies with project status and updates for capital improvement projects across Harris County. Partner agencies include TxDOT, the Harris County Flood Control District, METRO, the Harris County Toll Road Authority, the City of Houston, and the Houston Parks Board. The tool was developed as a GIS using the Environmental Systems Research Institute platform. At a Glance $200,000 Design Cost Markets Power Services Utilities

US Soccer Federation HQ & National Training Center

US Soccer Federation HQ & National Training Center Fayetteville, GA In December 2023, the U.S. Soccer Federation (USSF), the governing body for soccer in the United States, announced the relocation of its national headquarters from Chicago, Illinois, to Fayetteville, Georgia. DCCM is proud to serve as part of the site development team for this nationally significant, fast-track project. Planned for more than 200 acres, the $228 million complex is designed to be one of the largest and most advanced soccer facilities in the country. At full build-out, it will include a 200,000 SF headquarters and training center, 25 competition-level outdoor fields, an indoor field, and supporting infrastructure for U.S. national teams, development programs, and community engagement. DCCM is providing comprehensive surveying, civil site design, utility coordination, and permitting services to support successful on-time delivery. The facility is expected to open in Spring 2026, just ahead of Atlanta’s role as a host city for the FIFA Men’s World Cup. At a Glance 200+ Acres $228M Project Cost Markets Buildings Land Development Services Land & Site Development Utilities Surveying Water

Bourbon Brothers and Boot Barn Hall

The Hall at Bourbon Brothers Event Venue

The Hall at Bourbon Brothers Event Venue Gainesville, GA DCCM was proud to support the development of Bourbon Brothers Smokehouse & Tavern and Boot Barn Hall live music venue in Gainesville, Georgia. Situated at the northeast corner of Jesse Jewell Parkway and West Academy Street, this high-profile project brings a new dining and entertainment experience to the heart of downtown.   The development includes a ~9,000-square foot restaurant and a ~16,000-squarefoot concert and event venue, along with supporting infrastructure including access drives, parking, drainage improvements, underground storm water retention and site utilities. The site, located within an existing paved lot, required creative design solutions to blend into the growing urban fabric of Gainesville.   With the Bourbon Brothers project, DCCM continues its commitment to shaping quality spaces across North Georgia that enhance community, drive economic growth, and support long-term success for our partners. At a Glance 25,000 Square Feet $61,500 Project Cost Markets Land Development Buildings Water Services Land & Site Development Utilities Water

Dollar General Stores

Dollar General Stores

Dollar General Stores Statewide | Georgia Since 2012, DCCM has been a trusted partner to Sullivan-Wickley Properties, LLC in supporting the strategic expansion of Dollar General stores across Georgia. With more than 200 locations and counting, our team has delivered comprehensive due diligence, surveying, civil design, and permitting services for sites in urban, suburban, and rural communities throughout the state.  Georgia’s diverse topography and soil conditions, from mountainous terrain to coastal plains, demand adaptive, site-specific solutions. DCCM brings extensive experience in tailoring national site development standards to meet the unique requirements of local jurisdictions. Our thorough due diligence process supports confident Go / No-Go decisions, while our proactive coordination with municipalities frequently accelerates permitting without the need for variances. When additional entitlement services are required, our in-house experts are ready to lead the process. This partnership reflects DCCM’s broader track record of supporting multi-site regional and national rollouts for brands such as Taco Bell, Del Taco, Pep Boys, and Texaco, representing over 700 locations across several states. At a Glance 200+ Locations Markets Land Development buildings Surveying Services Land & Site Development Surveying Utilities

Kubota Manufacturing of America (KMA)

Kubota Manufacturing of America (KMA) Gainesville, GA For more than two decades, DCCM has served as a trusted site services consultant to Kubota Manufacturing of America (KMA), one of Georgia’s premier producers of agricultural and construction equipment. As KMA’s operations have expanded, so has our role—providing comprehensive civil engineering and site development services to support long-term growth and innovation. Key Milestones:  2017 – Development of a new 498,860 SF RTV manufacturing facility on a 50-acre parcel  2022 – Site development for KMA’s $85M North American R&D Center on 280 acres, featuring 133,000 SF of office, workshop, and test track facilities, bringing 200 new jobs to the area  2024 – A new $190M, 700,000 SF front-end loader manufacturing facility on 50 acres, expected to create 500 jobs when fully operational  At a Glance 1,331,860 Square Feet $275M Project Cost Markets Land Development Buildings Services Land & Site Development Program Management Utilities Surveying

Wheatland Wastewater Improvements

Wheatland Wastewater Improvements Wheatland, IN DCCM led an internal and external team of engineers to design and develop a new sanitary sewer system for the Town of Wheatland. This system included designing three positive displacement blowers for a new extended aeration plant along with several miles of new low pressure force main, one lift station, and a package wastewater treatment plant for the town of 500 people. The team evaluated wastewater lagoons for Wheatland being crucial for maintaining compliance with regulations and ensuring effective treatment. One of the key challenges in the design of project was ensuring the project met the Town’s limited budget, supported by a $14M SRF grant award for water/wastewater. Through a combination of creative design and funding solutions and selection of a minimally invasive technology such as low pressure sewer, DCCM was able to secure reasonable bids that allowed the project to proceed. At a Glance 10 Miles $10.2M Project Cost “The team (DCCM) is nothing short of amazing on the projects we have worked on with them. They are always organized and available if there are questions. I have seen Aaron Crow, Poject Manager, work along with his team members as he is always clear and concise on what he is asking for. I believe the team excels under his leadership and never feel overwhelmed or worried about the projects because they communicate with us to keep everyone organized and on task. They have definitely been an asset to our Town and Utility!” Erika Goble Wheatland Deputy Clerk Markets Municipal Water Services water Conveyance Treatment Water Resources

Fox Factory Corporate Relocation

Fox Factory Corporate Relocation Gainesville, GA When Fox Factory – a premier designer and manufacturer of high-performance suspension systems – opted to relocate its headquarters from California to Georgia, DCCM was selected to support the transition from the ground up. As part of a confidential, fast-tracked initiative, we provided strategic site selection and civil engineering services to help identify and evaluate multiple locations before securing a 23-acre site for the company’s new home.  The resulting 350,000 square foot vertically integrated campus now houses manufacturing, distribution, and office operations for more than 800 employees. Working in collaboration with Carroll Daniel Construction Co. as part of a design-build team, DCCM delivered civil site services that contributed to a 16-month, on-budget completion.  At a Glance 350,000 Square Feet $47M Project Cost Markets Land Development Services Land & Site Development Surveying

Panther Parkway

Panther Parkway

Panther Parkway Sebring, FL PHASE I – In fall 2001, DCCM completed the design for widening approximately one mile of Fairmount Drive from a two-lane local road to a five-lane major collector with sidewalks. Construction was completed by the end of 2002 at a cost of $500,000. PHASE II – DCCM supported the County by designing highway lighting and signalization for six intersections and preparing the design and permitting for six stormwater retention ponds along the two-mile route. PHASE III – In January 2017, DCCM contracted with the Highlands County Board of County Commissioners to modify the design of a 4.3-mile segment of Sebring Parkway Phase III between Sebring and Avon Park. The original design and permit, completed by others, proved cost-prohibitive and jeopardized an FDOT CIGP Grant. Leveraging our expertise in stormwater permitting, DCCM redesigned the entire roadway and modified the Environmental Resource Permit, managing $3.2M in FDOT funding. Construction, estimated at $8M, began in March 2018. By August 2019, the north-end connection to the Memorial Drive Roundabout was completed, and the Sebring Roundabout (formerly Panther Parkway) on the south end was finished by year-end 2019. At a Glance 4.3 Miles Project Size $10M Project Cost Markets Transportation Services Transportation

PK Avenue Stormwater & Roadway Improvements

PK Avenue Stormwater & Roadway Improvements

PK Avenue Stormwater & Roadway Improvements Auburndale, FL DCCM provided watershed planning, conceptual design, feasibility analysis, surveying, and cooperative funding support to develop a concept improvement plan for 3,500 linear feet of PK Avenue.  As the gateway to downtown Auburndale, the City sought improvements that would not only resolve chronic roadway flooding and enhance stormwater quality for the 261-acre urban drainage basin but also improve neighborhood aesthetics and add a pedestrian trail for recreation.  The recommended concept redeveloped PK Avenue from four lanes to two and incorporated low-impact development techniques, including bio-retention swales, on-street pervious parking with subsurface storage, and a one-acre retention pond. Our team also assisted the City in securing $1.3M in cooperative funding from the Southwest Florida Water Management District (SWFWMD). At a Glance 2019 Grand Award for Engineering Excellence in Water and Stormwater from ACEC-FL Award 2019 Award of Merit from ASLA-FL Award Markets Water Surveying Services Water Surveying